Final assembly in the Päri facility
The Päri unit is equipped with the lifting and production capacity required for final assembly, enabling the assembly of large-scale metal structures and equipment.
The assembly halls have a maximum lifting capacity of up to 20 tons, and the site allows loading operations with a forklift of up to 5.7 tons.
Reliability and precision are ensured by a stationary hydraulic power unit (350 bar / 300 L/min), a tube bending machine for hydraulic pipes up to Ø42, a hose crimping press, and a Walform tube-end forming press.
In addition, all necessary equipment is available for mechanical, hydraulic, and electrical assembly, as well as system testing.
The Päri production environment is designed to support the final assembly of large-scale projects, where precision, occupational safety, and efficient collaboration between production stages are essential.